Client
CSX Transportation
Location
Curtis Bay, Baltimore, MD
Key Challenges & Project Details
- Placed over 5,500 CY of concrete including over 1000 cast in place concrete rail ties on 900’x110’ coal loading pier
- Installed 700 LF cast in place drainage trench
- Installed new graded concrete deck on the pier to provide positive drainage to new trench
- Installed 10” directionally bored force main and pump system to move drainage trench water to upland storage pond
- Removed and replaced coal loading conveyor system & crane rails, and supplied new water and electric service to the pier
- Project required heavy multi-crane lifts to move coal loading truss on/off pier during construction
- CMC sequenced work to allow CSX operate coal loading operations on the project continuously throughout construction
Awards Received
- ACI Maryland – Excellence in Concrete Award