Client
City of Petersburg Public Works
Location
Petersburg, Virginia
Key Challenges & Project Details
- Construction of a new, two lane bridge over Brickhouse Run
- Reconstruction of roadway
- Removal and relocation of utilities within the new roadway alignment
- Installation of 24 inch sanitary sewer pipe, four inlets and one manhole
- Water main relocation
- 16 Verizon fiber-optic communication lines encased in the existing structure supported in place throughout construction
- The new “Omega Span” bridge encompasses 13 pre-cast concrete segments and pre-cast concrete wing walls, spanning 24 feet over the existing bridge with a portion of the granite block masonry abutments
- Installation of a decorative steel balustrade bridge rail and a historical stone veneer to exposed portions of the Omega Span
- The pre-cast bridge is founded on H-pile supported, cast in place concrete footings
- Brickhouse Run environmentally protected by utilizing a stream diversion
- Completed on time and on budget
- No recordable or lost time injuries