Locating position of the offshore platforms utilizing state of the art GPS survey equipment
Constructing the platforms in a harsh offshore marine environment
Prefabricating portions of the platforms reduced construction time thereby decreasing exposure in the offshore environment
Developing an extensive spill prevention and emergency response plan for the project
Handling of environmentally sensitive products such as diesel fuel and drilling spoils, as well as drilling fluids and admixtures that had to be contained at all times
Providing all equipment necessary to perform all of the heavy lifts for the project (many in excess of 85,000 lbs)
Constructing the platforms utilizing design build principles and techniques
Providing geotechnical and civil engineering for the platforms through engineers that we have worked with on many projects, both land-based and marine
Developing the most cost efficient design that reduced costs and helped to streamline construction time to allow the project to proceed ahead of schedule