Client
Branscome Richmond/Richmond Metropolitan Authority
Location
Richmond, Virginia
Key Challenges & Project Details
- Project consisted of the reconfiguration of the existing toll plaza at Powhite and Chippenham Parkways
- Toll facility construction included a new tunnel, flatwork and raised medians for the seven-lane toll plaza
- Project required placement of 2500 SY of fiberglass reinforced concrete pavement for seven toll lanes at new toll plaza facility
- Project included construction of 10’ X 10’ hydraulic cement concrete tunnel below seven toll lanes
- Project required removal and modification of two toll plaza lanes and canopy, completed in less than 24 hours
- Project required installation of new drainage system and utilities with two RW-2 retaining walls
- Project required excavation of 1430 CY of bedrock for installation of the RW-2 retaining walls
- Other aesthetic improvements included new railings and modular block retaining walls
- Job was completed on time and under budget
- No recordable or lost time injuries