Key Challenges & Project Details
- Project consisted of construction of a Roll On/Roll Off platform, a 100 foot square, 2 foot thick, concrete pier
- Platform supported by 65 foot long, pre-stressed concrete piles
- Piles installed within a three inch tolerance in 35 feet of water
- Installation in active port area with work subject to open wave action
- Responsibility included delivery, installation, pile cut-offs, and testing of concrete piles
- All piling installed on time with no breakage